St. Louis Park, MN
Home MenuCentral Park West
Latest updates
- Central Park West Apartments – opened December 2017 (phase I: 199 units)
- Arlo West End – opened fall 2020 (phase II: 164 units)
- AC Hotel by Marriott – opened spring 2018
- 10 West End – opened January 2021 and tenant improvements are continuing
- Caraway - opened fall 2023 (phase VI: 207 units)
- James Brenner sculpture – designed and installed artwork in the civic space
Project background
One more office building is proposed at The West End at I-394 and Highway 100. The area's overall plans include two six-story, multiple-family residential buildings; a six-story, limited-service hotel; two 11-story office buildings; a 2,534-stall parking ramp and a central civic space. At full build-out, the multiphase development proposes 363 residential units with 11 affordable units, 126 hotel rooms, and 706,706 square feet of class A office space. Utica Avenue South was reconstructed along the west boundary of the development.